Case Studies
Real work. Real results.
We don't talk about what we could do. We show you what we've already done.
Client
Professional services, 25 employees, 12 trucks
Problem
Manual dispatching was costing 45 minutes per truck per day in wasted time. Missed calls, double bookings, and lost revenue added up to an estimated $100,000 per year.
What we did
Built a custom dispatch system with automated scheduling, real-time tracking, and customer notifications. Delivered in 6 weeks.
Results
Reduced dispatch time by 80%. Eliminated double bookings. Recovered an estimated $85,000 in annual labor costs.
Client
Government contracting, 40 employees
Problem
A prime contractor required CMMC Level 2 certification. The company had no formal security program and 90 days to get ready for assessment.
What we did
Conducted a gap assessment, built the required documentation, implemented technical controls, and ran a mock assessment. Completed in 8 weeks.
Results
Passed CMMC assessment on the first attempt. Retained $2.4 million in annual contract revenue.
Client
Healthcare, 6 locations, 80 employees
Problem
A 15-year-old patient management system was slowing down operations and couldn't integrate with new tools. Downtime was costing $5,000 per month in lost productivity.
What we did
Rebuilt the system with a modern architecture, migrated all data, and integrated with existing tools. Delivered in phases over 10 weeks.
Results
Reduced system downtime by 95%. Cut patient processing time by 40%. Eliminated $60,000 in annual lost productivity.
Want results like these?
Every engagement starts with understanding what's not working. Tell us about your situation and we'll show you what we'd do.
Get your free assessment