Skip to main content

Case Studies

Real work. Real results.

We don't talk about what we could do. We show you what we've already done.

Client

Professional services, 25 employees, 12 trucks

Problem

Manual dispatching was costing 45 minutes per truck per day in wasted time. Missed calls, double bookings, and lost revenue added up to an estimated $100,000 per year.

What we did

Built a custom dispatch system with automated scheduling, real-time tracking, and customer notifications. Delivered in 6 weeks.

Results

Reduced dispatch time by 80%. Eliminated double bookings. Recovered an estimated $85,000 in annual labor costs.

Client

Government contracting, 40 employees

Problem

A prime contractor required CMMC Level 2 certification. The company had no formal security program and 90 days to get ready for assessment.

What we did

Conducted a gap assessment, built the required documentation, implemented technical controls, and ran a mock assessment. Completed in 8 weeks.

Results

Passed CMMC assessment on the first attempt. Retained $2.4 million in annual contract revenue.

Client

Healthcare, 6 locations, 80 employees

Problem

A 15-year-old patient management system was slowing down operations and couldn't integrate with new tools. Downtime was costing $5,000 per month in lost productivity.

What we did

Rebuilt the system with a modern architecture, migrated all data, and integrated with existing tools. Delivered in phases over 10 weeks.

Results

Reduced system downtime by 95%. Cut patient processing time by 40%. Eliminated $60,000 in annual lost productivity.

Want results like these?

Every engagement starts with understanding what's not working. Tell us about your situation and we'll show you what we'd do.

Get your free assessment